EasyManua.ls Logo

Manitowoc GROVE GMK 6400

Manitowoc GROVE GMK 6400
960 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.9 Rigging work on the main boom
Operating manual GMK 6400 3 112 993 en 12 - 113
12.07.2013
Detach the lifting limit switch weight (2)
from the hoist rope;
à p. 12 - 129.
Unreeve the hoist rope; à p. 12 - 118.
Secure the hook block (1) for transport.
Set down the main boom on the boom rest.
Fastening the hoist rope to the bumper
Do not attach the rope end fitting to the front towing coupling! The towing
coupling must be free for a tow-rod in emergencies.
Attach the rope end fitting to the retaining
rope (1).
Pull the hoist rope slightly taut.
Fasten the lifting limit switch weight to the
hoist rope.
The hoist rope and lifting limit switch weight
are now secured for driving.

Table of Contents

Related product manuals