Table 205. Airframe Periodic Inspection — Area 5, Powerplant (Cont.)
Registration No. Serial No. Helicopter Total Hours
Model InitialRMM SectionRequirement
Engine Exhaust System
900 Examine left and right primary exhaust nozzles:
Primary exhaust nozzle for damage and condition
Exhaust nozzle V−band clamp for correct installation and security.
78−00−00
900 Examine left and right engine secondary ejectors:
Inlet, outlet, and interior for damage and condition
Insulation blankets for damage, condition, correct installation, and
security of lockwire
Mounting brackets for damage, condition, and security of attach
hardware.
78−00−00
For rotorcraft with PW206E or PW207E engines installed:
900 Examine primary exhaust nozzle assembly (Inconel):
For cracks and defects.
78−00−00
Environmental Control System
If the optional heat/defog system is installed:
900 Do the “Heat/Defog System Leak Check Functional Test”. 21−40−00
Fire Protection
900 Examine area engine deck mounted fire/overheat detection system
detection cable, grommets, brackets, and cable connectors for
condition and security.
26−10−20
If the optional fire−extinguishing system is installed:
900 Examine the fire−extinguishing system engine compartment
distribution tubes and supports for condition and security.
26−20−20
Electrical Power
900 Examine area electrical wiring and electrical component installation
for condition, support, and security of attach hardware.
98−00−00
Airframe Periodic Inspection Certification — Area 5, Powerplant
I certify that this aircraft has been inspected in accordance with Airframe Periodic Inspection requirements and
is determined to be in an airworthy condition.
Signature
Rating Type or Certification No.
Date