D-4 Electrical Safety Inspection 
 
  LIMITS 
For BF    applied parts, 
 
100µA in Normal Condition. 
 
500µA in Single Fault Condition. 
D.8  Mains on Applied Part Leakage 
The Mains on Applied Part test applies a test voltage, which is 110% of the mains voltage, 
through a limiting resistance, to selected applied part terminals. Current measurements 
are then taken between the selected applied part and earth.    Measurements are taken 
with the test voltage (110% of mains) to applied parts in the normal and reverse polarity 
conditions. 
The following outlet conditions apply when performing the Mains on Applied Part test. 
 
Normal Polarity; 
 
Reversed Polarity. 
 
  LIMITS 
 
For BF    applied parts: 5000 µA. 
 
D.9  Patient Auxiliary Current   
Patient Auxiliary currents are measured between any selected Applied Part connector and 
the remaining Applied Part connectors. All measurements may have a true RMS only 
response. 
 
The following outlet conditions apply when performing the Patient Auxiliary Current test.   
 
normal polarity( Normal Condition); 
 
reverse polarity( Normal Condition); 
 
normal polarity with open neutral(Single Fault Condition);   
 
reverse polarity with open neutral(Single Fault Condition); 
 
normal polarity with open earth(Single Fault Condition);   
 
reverse polarity with open earth(Single Fault Condition). 
  LIMITS 
For BF   applied parts, 
 
100µA in Normal Condition. 
 
500µA in Single Fault Condition. 
Note:
Make sure the safety analyzer is authorized comply with requirement of 
IEC61010-1.   