EasyManuals Logo

Oracle SuperCluster T5-8 User Manual

Oracle SuperCluster T5-8
356 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #108 background imageLoading...
Page #108 background image
Preparing for Cooling
Configuration BTU/Hour kj/Hour
Typical 8,654 9,129
Maximum 11,516 12,149HC Quarter rack
Typical 8,061 8,505
Maximum 2,037 2,149Individual EF storage server
Typical 1,426 1,504
Maximum 1,825 1,926Individual HC storage server
Typical 1,278 1,348
The direction of airflow is front to back for the main and expansion racks.
Caution - Do not restrict the movement of cool air from the air conditioner to the cabinet, or the
movement of hot air out of the rear of the cabinet.
Observe these additional requirements:
Allow a minimum clearance of 914 mm (36 inches) at the front of the rack, and 914 mm (36
inches) at the rear of the rack for ventilation. There is no airflow requirement for the left and
right sides, or the top of the rack.
If the rack is not completely filled with components, cover the empty sections with filler
panels.
108 Oracle SuperCluster T5-8 Owner's Guide • May 2016

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SuperCluster T5-8 and is the answer not in the manual?

Oracle SuperCluster T5-8 Specifications

General IconGeneral
BrandOracle
ModelSuperCluster T5-8
CategoryServer
LanguageEnglish

Related product manuals