Connecting an Expansion Rack to Oracle SuperCluster T5-8
Leaf Switch Connection Cable Length
R8 IB2 to Rack 6 R8-IB2-P11A to R6-IB1-P9B 5 meters
R8 IB2 to Rack 7 R8-IB2-P1B to R7-IB1-P10B 5 meters
Nine-Rack Cabling
The following table shows the cable connections for the switches when cabling nine racks
together.
Note - Cable lengths for racks 9 through 18 vary depending on the layout of the racks. Up to
100 meters is supported.
TABLE 122
Leaf Switch Connection for the Ninth Rack in the System
Leaf Switch Connection
R9 IB3 to Rack 1 R9-IB3-P8B to R1-IB1-P11A
R9 IB3 to Rack 2 R9-IB3-P9A to R2-IB1-P11A
R9 IB3 to Rack 3 R9-IB3-P9B to R3-IB1-P11A
R9 IB3 to Rack 4 R9-IB3-P10A to R4-IB1-P11A
R9 IB3 to Rack 5 R9-IB3-P10B to R5-IB1-P11A
R9 IB3 to Rack 6 R9-IB3-P11A to R6-IB1-P11A
R9 IB3 to Rack 7 R9-IB3-P11B to R7-IB1-P11A
R9 IB3 to Rack 8 R9-IB3-P9A to R8-IB1-P11A
R9 IB2 to Rack 1 R9-IB2-P8B to R1-IB1-P11B
R9 IB2 to Rack 2 R9-IB2-P9A to R2-IB1-P11B
R9 IB2 to Rack 3 R9-IB2-P9B to R3-IB1-P11B
R9 IB2 to Rack 4 R9-IB2-P10A to R4-IB1-P11B
R9 IB2 to Rack 5 R9-IB2-P10B to R5-IB1-P11B
R9 IB2 to Rack 6 R9-IB2-P11A to R6-IB1-P11B
R9 IB2 to Rack 7 R9-IB2-P11B to R7-IB1-P11B
R9 IB2 to Rack 8 R9-IB2-P8A to R8-IB1-P11B
Ten-Rack Cabling
The following table shows the cable connections for the switches when cabling ten racks
together.
Connecting Expansion Racks 345

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SuperCluster T5-8 and is the answer not in the manual?