Preparing the Network
“Unpacking Area” on page 113
“Physical Specifications” on page 96
Unpacking Area
Use a conditioned space to remove the packaging material to reduce particles before entering
the data center.
Allow enough space for unpacking it from its shipping cartons. Ensure that there is enough
clearance and clear pathways for moving the rack from the unpacking location to the
installation location.
Related Information
“Shipping Package Dimensions” on page 111
“Access Route Guidelines” on page 112
“Loading Dock and Receiving Area Requirements” on page 111
“Physical Specifications” on page 96
Preparing the Network
Prepare your network for Oracle SuperCluster T5-8.
“Network Connection Requirements” on page 113
“Network IP Address Requirements” on page 114
“Prepare DNS for the System” on page 114
Network Connection Requirements
The minimum number of physical network connections are listed below.
Parameter Comments Full Rack Half Rack
Network drops (minimum
quantities)
1 Gb Ethernet
10 Gb Ethernet
1 x 1 GB
4 x 10 GB if using one connection per
SPARC T5-8
1 x 1 GB
2 x 10 GB if using one connection
per SPARC T5-8
Preparing the Site 113

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SuperCluster T5-8 and is the answer not in the manual?

Oracle SuperCluster T5-8 Specifications

General IconGeneral
BrandOracle
ModelSuperCluster T5-8
CategoryServer
LanguageEnglish

Related product manuals