EasyManuals Logo

Planet WGSW-28040 User Manual

Planet WGSW-28040
285 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #28 background imageLoading...
Page #28 background image
User’s Manual of WGSW-28040 / 28040P
28
Figure 2-9 Mounting Managed Switch in a Rack
Step6: Proceeds with the steps 4 and steps 5 of session 2.2.1 Desktop Installation to connect the network cabling and supply
power to the Managed Switch.
2.2.3 Installing the SFP transceiver
The sections describe how to insert an SFP transceiver into an SFP slot.
The SFP transceivers are hot-pluggable and hot-swappable. You can plug-in and out the transceiver to/from any SFP port
without having to power down the Managed Switch. As the Figure 2-10 appears.
Figure 2-10 Plug-in the SFP transceiver

Table of Contents

Other manuals for Planet WGSW-28040

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Planet WGSW-28040 and is the answer not in the manual?

Planet WGSW-28040 Specifications

General IconGeneral
BrandPlanet
ModelWGSW-28040
CategorySwitch
LanguageEnglish

Related product manuals