Operation with operator panel
To connect the operator panel to the Control
Unit, you have to plug in the supplied connect‐
ing cable to the Control Unit and the operator
panel.
Fasten the plug connector in the door with the
supplied clamp.
9HUELQGXQJVOHLWXQJ]XP2SHUDWRU3DQHO
)L[LHUXQJ
Installing
4.5 Connecting the interfaces for the inverter control
Converter with the CU230P-2 Control Units
108 Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE

Table of Contents

Other manuals for Siemens CU240B-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens CU240B-2 and is the answer not in the manual?

Siemens CU240B-2 Specifications

General IconGeneral
BrandSiemens
ModelCU240B-2
CategoryInverter
LanguageEnglish

Related product manuals