4.1.1 Control cabinet
Assign the various devices to zones in the control cabinet.
Electromagnetically uncouple the zones from each other by means of one of the following
actions:
Side clearance ≥ 25 cm
Separate metal enclosure
Large-area partition plates
Route cables of various zones in separate cable harnesses or cable ducts.
Install filters or isolation amplifiers at the interfaces of the zones.
Control cabinet assembly
Connect the door, side panels, top and base plate of the control cabinet with the control
cabinet frame using one of the following methods:
Electrical contact surface of several cm² for each contact location
Several screw connections
Short, finely stranded, braided copper wires with cross-sections
≥ 95 mm² / 000 (3/0) (‑2) AWG
Install a shield support for shielded cables that are routed out of the control cabinet.
Connect the PE bar and the shield support to the control cabinet frame through a large
surface area to establish a good electrical connection.
Mount the control cabinet components on a bare metal mounting plate.
Connect the mounting plate to the control cabinet frame and PE bar and shield support
through a large surface area to establish a good electrical connection.
For screw connections onto painted or anodized surfaces, establish a good conductive
contact using one of the following methods:
Use special (serrated) contact washers that cut through the painted or anodized surface.
Remove the insulating coating at the contact locations.
Measures required for several control cabinets
Install equipotential bonding for all control cabinets.
Screw the frames of the control cabinets together at several locations through a large
surface area using serrated washers to establish a good electrical connection.
In plants and systems where the control cabinets are lined up next to one another, and
which are installed in two groups back to back, connect the PE bars of the two cabinet
groups at as many locations as possible.
Installing
4.1 EMC-compliant setup of the machine or plant
Converter with the CU230P-2 Control Units
58 Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE

Table of Contents

Other manuals for Siemens CU240B-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens CU240B-2 and is the answer not in the manual?

Siemens CU240B-2 Specifications

General IconGeneral
BrandSiemens
ModelCU240B-2
CategoryInverter
LanguageEnglish

Related product manuals