Wiring the terminal strip in compliance with EMC
If you use shielded cables, then you must connect the shield to the mounting plate of the
control cabinet or with the shield support of the inverter through a good electrical connection
and a large surface area.
Further information about EMC-compliant wiring is available on the Internet:
EMC installation guideline (
http://support.automation.siemens.com/WW/view/en/
60612658)
Use the shield connection plate of the Control Unit to connect the shield as strain relief.
Control Units (Page 33)
Installing
4.5 Connecting the interfaces for the inverter control
Converter with the CU230P-2 Control Units
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE 135

Table of Contents

Other manuals for Siemens CU240B-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens CU240B-2 and is the answer not in the manual?

Siemens CU240B-2 Specifications

General IconGeneral
BrandSiemens
ModelCU240B-2
CategoryInverter
LanguageEnglish

Related product manuals