5. Wait until all inverter LEDs are dark.
6. Switch on the inverter power supply again. Your settings become effective after switching
on.
You have transferred the settings to the inverter.
Saving the settings and series commissioning
7.3 Saving settings to an operator panel
Converter with the CU230P-2 Control Units
384 Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE