Commissioning
5.3 Procedure for commissioning via STARTER
Inverter chassis units
Operating Instructions, 07/2016, A5E00331449A
133
Figure 5-6 Setting the interface
Note
Precondition
To parameterize the interface, yo
u must install the appropriate interface card (e.g., PC