EasyManua.ls Logo

Siemens SINAMICS G130 - Page 177

Siemens SINAMICS G130
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
5.5 First commissioning with the AOP30
Inverter chassis units
Operating Instructions, 07/2016, A5E00331449A
177
Table 5- 3 Meaning of the bit settings for p0405
Bit
Meaning
Value 0
Value 1
0
Signal
Unipolar
Bipolar
1 Level HTL TTL
2
Track monitoring
None
A/B>< -A/B
3 Zero pulse 24 V unipolar Same as A/B track
4
Switching threshold
Low
High
5
Pulse/direction
No
Yes
NOTICE
Material damage when selecting the incorrect encoder supply voltage
Once the encoder has been commissioned, the supply voltage (5/24 V) set for the encoder
is activated on the SMC30 module. The encoder may be damaged, if a 5 V encoder is
connected and the supply voltage has not been set correctly (bit 20 = "Yes," bit 21 = "No").
Set the correct supply voltage for the connected encoder.

Table of Contents

Other manuals for Siemens SINAMICS G130

Related product manuals