6.1.2 Reforming before commissioning
If reforming is not possible every year, institute reforming on stored devices before
commissioning. Note that the voltage levels depend on the storage time.
The following graphic shows the predominant supply connection.
X10
L1
N PE
T2
L1
F1
PE
N
T1
X10
L1
F1
PE
L1 L2
T2
T1
PE
L3
L2
L3
L1–L3 Lines 1 to 3
N Neutral conductor
PE Grounding conductor
F1 Fuse
T1 Variable transformer
T2 Drive controller