EasyManua.ls Logo

Suzuki RM250 - Kick Starter Reassembly and Inspection

Suzuki RM250
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KICK STARTER 8-5
REASSEMBLY
Reassemble the kick starter assembly in the reverse order of
disassembly. Pay attention to the following points:
Apply transmission oil to the kick starter shaft.
Install the return spring 1 into the kick starter shaft hole A.
Install the spring guide 2 with the groove B of the spring
guide engaged with the return spring 1.
Install the kick starter drive gear 3 and washer 4 to the kick
starter shaft.
Install the new snap ring 5 firmly with snap ring pliers.
09900-06107: Snap ring pliers
Install the kick starter assembly to the crankcase and hook
the return spring.
Install the kick starter idle gear washer and new snap ring.
09900-06107: Snap ring pliers

Table of Contents

Related product manuals