EasyManua.ls Logo

Suzuki RM250 - Post-Engine Installation Inspection

Suzuki RM250
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-10 ENGINE REMOVAL AND INSTALLATION
INSPECTION AFTER ENGINE MOUNTING
After mounting the engine, inspect the followings.
Transmission oil level (2-9)
Engine coolant level (2-11)
Throttle cable play (2-13)
Clutch cable play (2-13)
Drive chain slack (2-16)
Brake pedal height (2-20)
Wire, cable and hose routing (18-13 to -15)

Table of Contents

Related product manuals