EasyManua.ls Logo

Suzuki RM250 - Front Wheel Service

Suzuki RM250
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FRONT AND REAR WHEELS 14-3
REMOVAL
Place the motorcycle on a block to lift front wheel off the
ground.
Remove the axle nut 1.
Loosen the left axle holder bolts 2.
Loosen the right axle holder bolts 3.
Remove the front axle shaft 4.
Remove the front wheel and spacers.
INSPECTION
SPACER AND DUST SEAL
Inspect the left and right wheel spacers and dust seals for
wear and cracks.
If any damage is found, replace the spacer together with the
dust seal.
NOTE:
Apply grease to the spacer and dust seal when reassembling.
99000-25010: SUZUKI SUPER GREASE “A”
(or equivalent grease)
AXLE SHAFT
Support the axle shaft with V-blocks and measure the axle shaft
runout.
Wheel axle runout
Service limit: 0.25 mm (0.010 in)
09900-20607: Dial gauge (1/100 mm)
09900-20701: Magnetic stand
09900-21304: V-block set (100 mm)
WHEEL RIM (2-21)
Wheel rim runout
Service limit: 2.0 mm (0.08 in) ... axial and radial

Table of Contents

Related product manuals