EasyManua.ls Logo

Suzuki RM250 - Crankcase Reassembly

Suzuki RM250
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TRANSMISSION AND CRANKSHAFT 10-15
Install the gearshift cam 1 and gearshift shafts 2, 3.
NOTE:
Turn the gearshift cam to the neutral position and confirm that
the driveshaft and countershaft turn without resistance.
CRANKCASE REASSEMBLY
Install the new gasket and dowel pins.
Install the right crankcase half on the left crankcase half.
Tighten the crankcase bolts.
Crankcase bolt: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
NOTE:
Tighten the bolts gradually and diagonally to guide the crank-
shaft into the bearing. If it is hard to tighten the bolts, separate
the crankcase and confirm that the transmission parts are
assembled correctly.
Inspect the crankshaft, countershaft and driveshaft for smooth
movement.
Apply grease to new O-rings 1.
Fit the O-rings 1 and spacer 2 to the driveshaft.
99000-25010: SUZUKI SUPER GREASE “A”
(or equivalent grease)

Table of Contents

Related product manuals