EasyManua.ls Logo

Suzuki RM250 - Cylinder

Suzuki RM250
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CYLINDER, PISTON AND EXHAUST VALVE 6-11
CYLINDER
Install the cylinder in the reverse order of removal. Pay attention
to the following points:
Fit a new gasket 1 and dowel pins.
Apply engine oil to the cylinder bore.
Tighten the cylinder nuts to the specified torque according to
the specified tightening order as shown.
Cylinder nut: 38 N·m (3.8 kgf-m, 27.5 lb-ft)
Install the read valve. (11-12)
Tighten the exhaust valve rod bolt using the pin 2 as a stop-
per.
NOTE:
The pin 2 is one of the included parts.
Exhaust valve rod bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
Fit a new gasket and install the exhaust side valve cover 3.
Exhaust side valve cover bolt:
4.5 N·m (0.45 kgf-m, 3.0 lb-ft)
Install the caburetor. (11-7)
Install the exhaust pipe. (5-9)
Apply grease to the O-rings.
Install new O-rings 4 and 5.
99000-25010: SUZUKI SUPER GREASE “A”
(or equivalent grease)
NOTE:
Apply Bond to the stud bolt threads when assembling the
removed stud bolts into the cylinder.
99000-31140: SUZUKI BOND “1207B”

Table of Contents

Related product manuals