EasyManua.ls Logo

Suzuki RM250 - Cylinder Head; Inspection after Installation

Suzuki RM250
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-12 CYLINDER, PISTON AND EXHAUST VALVE
CYLINDER HEAD
Tighten the cylinder head nuts to the specified torque accord-
ing to the specified tightening order as shown.
Cylinder head nut:
Initial:15 N·m (1.5 kgf-m, 11.0 lb-ft)
Final: 25 N·m (2.5 kgf-m, 18.0 lb-ft)
Tighten the engine mounting bracket bolts. (5-8)
Tighten the spark plug. (2-6)
INSPECTION AFTER INSTALLATION
Route the wires, cables and hoses properly. (18-13 to -15)
Pour engine coolant. (2-12)
Check the throttle cable play. (2-13)

Table of Contents

Related product manuals