EasyManua.ls Logo

Suzuki RM250 - Page 157

Suzuki RM250
270 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12-8 COOLING SYSTEM
1 Washer
2 Water pump shaft
3 Water pump driven gear
4 Water pump case
5 Bearing
6 Oil seal
7 Impeller
8 Washer
Install the dowel pins 1 and a new gasket 2.
.
Tighten the crankcase cover bolts to the specified torque.
Crankcase cover bolt: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
After reinstalling the water pump, check the followings.
Kick starter lever (8-6)
Brake pedal (2-20, 5-9)
Transmission oil level (2-9)
Engine coolant level (2-11)
CAUTION
Use a new gasket to prevent engine coolant leakage.
Apply THREAD LOCK SUPER or equivalent thread lock
to outside of the oil seal before installing it.

Table of Contents

Related product manuals