Service Manual FB 7100 Dosing System
January, 2005 5C - 11
Installation Installation is done in the reverse order
C.2.9 Removing the up-key connection from suspension rail
Preparation Before removing the up-key connection from the suspension rail
• Open the door.
• Switch off the main switch.
• Remove the instant ingredient canisters, see Operator Manual.
• Remove suspension for ingredient canisters, see
this section, page 5C-9.
Removal Follow these steps to remove up-key.
Installation Installation is done in the reverse order.
Step Action Illustration
1 Remove one screw from stop
for canister.
2 Pull out stop for canister.
Step Action Illustration
1 Remove two screws from up-
key.
2 Remove up-key and spacing
bushes.