Service Manual FB 7100
January, 2005 2 - 11
2.5 Installing the vending machine
Introduction The installation instructions can be divided into the below topics:
• Connecting machine to mains and putting into operation
• Attaching loose parts
• Adjusting manual price indication
• Adjusting electronic price indication
• Checking valve settings
• Preparing machine for vend
Connecting
machine to mains
and putting it into
operation
Follow these steps to put machine into operation:
Attaching loose
parts
• Attach stickers to the machine.
• Unpack and relocate possible parts located in the waste bucket.
Adjusting manual
price indication
(Direct selection)
Follow instruction in Chapter 5 Section C, Housing/Cabinet:
• Removing the coin mechanism, see chap. 5.G.2.2, page 5G-2
• Removing the coin chute, see chap. 5.G.2.3, page 5G-3
• Replacing the selection signs, see chap. 5.G.2.4, page 5G-4.
Adjusting elec-
tronic price indica-
tion
Not yet implemented.
Checking valve
settings
When boiler is filled, check valve settings and possibly manufacturer’s set-
tings.
Preparing
machine for vend
• Rinse entire dispensing system twice.
• Fill ingredient canisters and insert on proper place.
• Close door and test all drink dispensings.
Step Action
1.
Follow the instructions of section “How to unpack the vending machine”.
2.
Connect the water supply and open the water stop valve.
3.
Insert the power supply plug and switch on power.
4.
Open door of machine.
5.
Remove ingredient canisters.
6.
Switch on main switch.
- Water should now flow into the boiler.
7.
Check for leakages.