26 About the manual
Installing and commissioning flowchart
Task See...
Identify the frame size of your drive: B...D. Operation principle and hardware
description: Type designation label
(page 33)
Plan the installation. Select the cables, etc.
Check the ambient conditions, ratings, required
cooling air flow, input power connection,
compatibility of the motor, motor connection, and
other technical data.
Planning the cabinet installation (page 35)
Planning the electrical installation
(page 47)
Technical data (page 319)
Option manual (if optional equipment is
included)
Unpack and check the units.
Check that all necessary optional modules and
equipments are present and correct.
Only intact units may be started up.
Note: If the converter is non-operational for more
than one year, reform the converter DC link
capacitors. For more information, contact your
ABB representative.
Mechanical installation: Unpacking
(page 44) and Checking the delivery
(page 45)
Check the installation site. Mechanical installation: Checking the
installation site (page 43)
Install the drive in a cabinet. Mechanical installation: Installing the drive
(page 46)
Route the cables. Planning the electrical installation: Routing
the cables (page 55)