892 J006 MNAH | PGC5000 G EN 2 | 95
5.5.10 Script control
Run a programmed script at a defined time into the analysis, method or sequence. A script must be
created prior to adding this TCF.
Table 5-12: Script control
Available from configuration
5.5.11 Skip next if
Skip the next time-coded function when this stream value equals the stream number entered in the
scheduler. This function allows skipping a TCF on a particular stream, usually because that TCF does
not apply to that stream.
Table 5-13: Skip next if
Available from configuration
5.5.12 Stream step
This begins the automatic sample purge of the sample stream being analyzed. It must occur after
completion of the sample inject for this stream. This is particularly important when the current stream
being analyzed requires multiple sample injections.
Table 5-14: Stream step
5.5.13 Temperature check
This evaluates temperature zone variances. A temperature value outside the zone limits initiates an
action in response.
Table 5-15: Temperature check
Available from configuration
Ignore, Abort, Skip, Display
5.5.14 Temperature control
This allows review or modification of the temperature zone set point and ramp rate at a specific time
during the analysis.
Table 5-16: Temperature control
Available from configuration