EasyManua.ls Logo

Abbott Diagnostics Aeroset - Page 115

Default Icon
456 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Daily Checks
AEROSET
®
Customer Training Guide 3-25
94858-103 — July 2003
4. Check each of the syringes in the pumps as described in step 2.
NOTE: Replace if leaking is observed.
NOTE: Refer to Component Replacement in Section 9,
Service and Maintenance of the AEROSET System
Operations Manual for details.
NOTE: It is normal for bubbles to appear in the Left ICT
Reference Pump syringe and associated tubing.
5. Close the front-right door and ICT Pump access door of the
Analyzer.

Table of Contents