1220 Infinity II LC System User Manual 143
Test Functions and Calibration
9
1220 Infinity II LC System
1220 Infinity II LC System
Installation Check
The Installation Check switches on all available modules, purges the system for
five minutes at 1 mL/min, tests the flow path by applying a pressure up to
200 bar and switches on the oven (if available) and detector.
The Installation Check passes if the following conditions are met:
• All modules switch on successfully within the timeout period (120 s).
• The pump achieves 200 bar after 5 min.
• The oven reaches 2 K above its actual temperature.
• The detector lamp ignites and the detector reaches a Ready state.