EasyManua.ls Logo

Agilent Technologies 1220 Infinity II LC - Exchanging the Plungers

Agilent Technologies 1220 Infinity II LC
398 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1220 Infinity II LC System User Manual 263
Maintenance and Repair
11
Solvent Delivery System
Exchanging the Plungers
1 Place a bottle with 100 mL of isopropanol in the solvent cabinet and attach
a bottle-head assembly (including tubing) to the bottle.
2 Connect the inlet tube from the bottle head directly to the inlet valve.
3 Connect one end of the Restriction capillary (5022-2159) to the purge valve.
Insert the other end into a waste container.
4 Open the purge valve and purge the system for 5 min with isopropanol at a
flow rate of 2 mL/min.
5 Close the purge valve and set the flow to a rate adequate to achieve a
pressure of 350 bar.
6 Pump for 15 min at this pressure to wear in the seals.
7 Turn off the pump and slowly open the purge valve to release the pressure
from the system.
8 Disconnect the restriction capillary and reinstall the bottle containing the
solvent for your application.
9 Rinse your system with the solvent used for your application.
CAUTION
This procedure is required for Standard seals (pack of 2) (5063-6589) only.
It will damage the PE seals (pack of 2) (0905-1420).
Never perform the seal wear-in procedure with normal-phase application seals.

Table of Contents

Related product manuals