1220 Infinity II LC System User Manual 49
Installation
3
Priming the System and Performing the ‘Installation Check’
Priming the System and Performing the ‘Installation Check’
The steps described below are performed using the Instrument Utility / Lab
Advisor software.
1 Connect all channels with HPLC grade water and use the Purge Pump for
flushing the solvent channels.
Software Revision B.01.04 and below:
• Tools > Pump > Purge Pump
Software Revision B.02.01 and higher:
• Service & Diagnostics > Pump (Tools must be checked) > Purge Pump
2 Prime all connected channels sufficiently until all channels are bubble free.
3 Use the Instrument Control functionality to prime your system with HPLC
grade water to remove air out of the system.
Apply the following conditions:
• Purge Valve: closed
• Flow: 2 mL/min
• Time: 5 min/channel
• Set stroke: 100 μL
4 Perform the Installation Check from the Service and Diagnostics menu and
print out the test result.
5 Create and print out a Status Report.