EasyManua.ls Logo

Agilent Technologies 1220 Infinity II LC

Agilent Technologies 1220 Infinity II LC
398 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1220 Infinity II LC System User Manual 49
Installation
3
Priming the System and Performing the ‘Installation Check’
Priming the System and Performing the ‘Installation Check’
The steps described below are performed using the Instrument Utility / Lab
Advisor software.
1 Connect all channels with HPLC grade water and use the Purge Pump for
flushing the solvent channels.
Software Revision B.01.04 and below:
Tools > Pump > Purge Pump
Software Revision B.02.01 and higher:
Service & Diagnostics > Pump (Tools must be checked) > Purge Pump
2 Prime all connected channels sufficiently until all channels are bubble free.
3 Use the Instrument Control functionality to prime your system with HPLC
grade water to remove air out of the system.
Apply the following conditions:
Purge Valve: closed
Flow: 2 mL/min
Time: 5 min/channel
Set stroke: 100 μL
4 Perform the Installation Check from the Service and Diagnostics menu and
print out the test result.
5 Create and print out a Status Report.

Table of Contents

Related product manuals