3 Installation
3.6 Motor feeder
Rapid Link 5 · RAMO5 · RASP5 05/20 MN034004EN www.eaton.com 111
Connect the motor cable screen braid to the ground potential (PES) at
the motor’s terminal box.
Figure 69: 360° screen contact at the motor terminal box
a 360° contact screen for the motor cable
b Clamp strap with screw for the screen braid
Connect the jointly twisted strands (U, V, W, and PE) and separately
twisted strands B1/B2 and T1/T2 to the corresponding terminals in the
motor or in the connector.
The substrate must be free from varnish (direct contacting).
The screen clamp shown in the illustration is an example of a large-area
ground connection (PES).
Figure 70: Connect the screen mesh (PES)
to the motor terminal box
b
a
a
U
V
W
UVWPE
PE
PES