EasyManua.ls Logo

Eaton Rapid Link 5 - Installation Instructions

Eaton Rapid Link 5
249 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Communication
9.2 EtherNet / IP
Rapid Link 5 · RAMO5 · RASP5 05/20 MN034004EN www.eaton.com 209
9.2.6 Installation instructions
During installation, ensure that the control cables, signal cables (0-10 V,
4-20 mA, 24 V DC, etc.), and the field bus system's (EtherNet/IP) connection
cables are not routed directly parallel to energy-carrying mains connection
cables or motor connection cables. With parallel cable routing, the clearances
between control, signal and field bus cables and energy-carrying mains
and motor cables must be greater than 30 cm.
Cables should always intersect at right angles.
Figure 115: Cable routing for EtherNet/IP and mains/motor cables
If the system requires a parallel routing in cable ducts, a partition must be
installed between the field bus cable and the mains and motor cable ,
in order to prevent electromagnetic interference on the field bus.
Figure 116: Separate routing in the cable duct
a Mains and motor connection cable
b EtherNet/IP cable
Never lay the cable of a field bus system directly parallel to the
energy carrying cables.
In all cases only use approved EtherNet/IP cables.
300 mm
(≧ 11.81“)
②①
a
b
a
b

Table of Contents

Related product manuals