6 RASP5 speed controller
6.4 Specific technical data
140 Rapid Link 5 · RAMO5 · RASP5 05/20 MN034004EN www.eaton.com
6.4.1 Overload capacity
The variable frequency drive modules in the RASP5 speed control unit allow
for an overload cycle of 150 % I
e
for 60 s every 600 s of operation.
After the overload phase (150 % I
e
for 60 s or 200 % I
e
for 2 s), 100 % of the
rated current I
e
can be continuously retrieved.
Figure 84: Overload cycle in operation