9
Troubleshooting and maintenance
9.4
Training manual • Basic training • Status 03.14
EOS P 396
click the Step movement up / down button.
9. Move recoater to the left filling position:
Click Filling position left button.
10. Load temperature job and determine building temperature.
☞ section 8, Checking, determining, setting building temperature.
11. Load a job.
☞ Operation EOS P 396 manual, section 6, Loading a job.
12. Adjust job:
• In the PSW delete from the job the SLI data already built.
☞ Operation EOS P 396 manual, section 6, Deleting parts.
• In the PSW move down SLI data for the parts still to be built.
☞ Operation EOS P 396 manual, section 6, Moving parts.
13. Start building process:
In the Minimum warm up time field select a value and accept with OK.
14. Monitor recoater alignment in the PSW in the Recoater adjustment group box in
the PSW main window during the building process.
See Troubleshooting, Maintenance and Spare parts, P 396 manual, section 4,
Checking, adjusting recoater alignment.
Note that between the parts built last and the newly loaded parts there must be
a powder layer of at least 3 mm.
The warm up value is dependent on the difference between the actual process
chamber temperature and the nominal temperature entered.