EasyManua.ls Logo

Fujitsu PRIMERGY RX1330 M5

Fujitsu PRIMERGY RX1330 M5
413 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CAUTION
In a system that is configured with ATD, only certain components
which support the respectively increased higher operating
temperature range may be installed and used. For applicable
restrictions, see the official configurator tool.
11.3 Upgrading or replacing the CPU
Field Replaceable Unit
(FRU)
Hardware: 15 minutes
Software: 5 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver
CAUTION
CPUs are extremely sensitive to electrostatic discharge and therefore
must always be handled with care.
After a CPU has been removed from its protective sleeve or from its
socket, place it upside down on a nonconducting, antistatic surface.
Never push a CPU over a surface.
Preliminary steps
"Locating the defective server" on page 43.
"Suspending BitLocker functionality" on page 69.
If applicable, "Removing the front cover with lock" on page 45.
"Shutting down the server" on page 46.
"Disconnecting the power cord" on page 47.
"Getting access to the component" on page 49.
"Removing the air duct" on page 65.
Processor (CPU)
232 Upgrade and Maintenance Manual RX1330 M5

Table of Contents

Related product manuals