Figure 163: Routing the FBU cable of the second FBU
▶
Route the FBU cable as shown in the figure.
Concluding steps
▶
"Reassembling" on page
53.
▶
"Connecting the power cord" on page
57.
▶
"Switching on the server" on page 60.
The recalibration of the FBU starts automatically, and finishes within a
few minutes.
▶
If applicable, "Installing the front cover with lock" on page 61.
9.6.3
Removing an FBU
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Expansion cards and backup units
216 Upgrade and Maintenance Manual RX1330 M5