EasyManuals Logo
Home>Fujitsu>Server>PRIMERGY RX1330 M5

Fujitsu PRIMERGY RX1330 M5 User Manual

Fujitsu PRIMERGY RX1330 M5
413 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #25 background imageLoading...
Page #25 background image
Step included Explanation
Server shutdown no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance, see "Starting the
maintenance task" on page
69.
Rack removal,
disassembly
yes
Making the server available, removing the
server from the rack (if applicable).
Transport no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks.
Transport no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly, rack
installation
yes
Reassembling the server, installing the
server in the rack (if applicable).
Starting up no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration
2.4 T
ools you need at hand
When preparing the maintenance task, ensure that all required tools are
available. You will find a list of required tools at the beginning of each
procedure.
Before you start
RX1330 M5 Upgrade and Maintenance Manual 25

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY RX1330 M5 and is the answer not in the manual?

Fujitsu PRIMERGY RX1330 M5 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY RX1330 M5
CategoryServer
LanguageEnglish

Related product manuals