GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-11 - Replacing Options 8 - 189
8-11-6 Replacement of the Gel Warmer Cap
This table includes information specific to these instructions. For more information 8-2-6 "Tools needed
for servicing the LOGIQ Totus" on page 8-5 /8-2-7 "PPE Required During Service" on page 8-6
8-11-6-1 Removal Procedure
8-11-6-2 Installation Procedure
1.) Parts to be installed in reverse order of removal
2.) Perform “Functional Checks after FRU replacement (Debrief Guideline)” as described in Section 8-
12 on page 8-223
Table 8-101 Manpower, Time, Tools, and PPE
Manpower Time Tools PPE
One person Approximately 5 minutes No tools required
Cut resistant gloves
Knee Pad
Step Corresponding graphic
1.
Twist the Gel Warmer Cap to remove it from the T2
Gel Warmer.