EasyManua.ls Logo

GE LOGIQ Totus

GE LOGIQ Totus
644 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HealthCare CONFIDENTIAL
DIRECTION 5936427, REV. 1 LOGIQ TOTUS Basic Service Manual
Section 8-11 - Replacing Options 8 - 189
8-11-6 Replacement of the Gel Warmer Cap
This table includes information specific to these instructions. For more information 8-2-6 "Tools needed
for servicing the LOGIQ Totus" on page 8-5 /8-2-7 "PPE Required During Service" on page 8-6
8-11-6-1 Removal Procedure
8-11-6-2 Installation Procedure
1.) Parts to be installed in reverse order of removal
2.) Perform “Functional Checks after FRU replacement (Debrief Guideline)” as described in Section 8-
12 on page 8-223
Table 8-101 Manpower, Time, Tools, and PPE
Manpower Time Tools PPE
One person Approximately 5 minutes No tools required
Cut resistant gloves
Knee Pad
Step Corresponding graphic
1.
Twist the Gel Warmer Cap to remove it from the T2
Gel Warmer.

Table of Contents

Related product manuals