EasyManua.ls Logo

Hamilton Microlab STAR - Page 220

Hamilton Microlab STAR
284 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Microlab
®
STAR Service Manual
9-8
Half-yearly Maintenance (continued)
Action Available Program
12. Removal of old files
Together with the Laboratory Supervisor check
for trace files witch may deleted from the
Operating PC.
Check for Traces files such as
method / system trace files
communication trace files
Check for old methods which may be removed
from PC
Back them up if necessary, else delete
Check for available disk space onto hard drive,
500 MB minimum are needed
N/A
ML STAR IVD additionally:
13.
Test tightness of seal for all Pipetting Heads. Maintenance
Procedure according
to ML STAR IVD
Operators Manual
14. Check the pressure adjustment values of
TADM.
PIP_PRESSURE_SIG
NALS_
CHECK.MCR

Table of Contents

Other manuals for Hamilton Microlab STAR