Microlab
®
STAR Service Manual
9-7
Half-yearly Maintenance (continued)
Action Available Program
8. Recover:
Autoload ribbon
29
Deck Panels
Pipetting Arm
N/A
9. Check and Adjust:
Pipetting Arm
Pipetting Channels
Autoload
30
Verify instrument with verification kit
Perform a test run
Adjustment is done
in accordance with
section 6 Adjustment
and Calibration on
page 6-1.
Verification Program
N/A
10.
Check all available Carriers:
For signs of liquid spillage and damage
If necessary: decontaminate and clean Carriers.
Ensure smooth gliding on Deck Panels and
Loading Trays.
Replace damaged carriers.
N/A
11.
Check Needles if available:
For signs of damage.
If necessary: decontaminate and clean Needles
Replace damaged Needles
N/A
Attention: Items for ML STAR and ML STAR IVD may vary, therefore ensure correct
parts are being used on the Instrument.
29
Microlab
®
-STAR Instrument with Autoload Option only
30
dito