EasyManua.ls Logo

Hitachi G200 - Page 265

Hitachi G200
418 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Before you begin
Wear a wrist strap connected to the storage system to prevent part
failures caused by static electricity. Do not remove the wrist strap until you
finish the procedure.
Confirm that the storage system power is turned on.
Use the maintenance utility to block the LAN blade.
The red CTL ALM LED on the CBLM or CBLH controller is on.
Procedure
1. Remove the LAN cable from the user LAN port.
2. Release the controller:
a. Loosen the blue right and left screws on the lever of the controller to
be replaced.
b. Open the lever.
Note: The POWER, READY, WARNING, and ALARM LEDs might go off. If
the LED on the front goes off, check whether a component other
than the controller has normal status in the Maintenance Utility
window and continue the replacement. The green READY LED on
the front of the CBLM/CBLH goes on after restoring the controller
at the end of the replacement procedure.
3. Loosen the blue screw that secures the LAN blade.
4. Using both hands, pull out and remove the LAN blade.
5. Insert the new LAN blade into the slot, just before the "shield finger."
6. Gently push the new LAN blade all the way into the slot.
7. Tighten the blue screw to secure the LAN blade.
Replacing a LAN blade 265
Service Guide for VSP Gx00 and VSP Fx00 Models

Table of Contents

Other manuals for Hitachi G200

Related product manuals