EasyManuals Logo

Honeywell equIP Series Installation And Configuration Guide

Honeywell equIP Series
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
EQUIP
®
Series ACUIX™ IP PTZ Dome Installation and Configuration Guide
Document 800-04194V1 Rev A 11
07/11
To install an in-ceiling housing in a hard ceiling:
1. Select the location where you want to install the housing and, using the
supplied template, cut a hole in the ceiling 7.64 in. (194 mm) in diameter.
2. If the ceiling is drywall or plaster, seal the perimeter of the hole with
adhesive tape or a plastic channel to prevent dust and debris from falling.
3. If required, install a safety cable to anchor the housing to a ceiling joist or
other structural member.
4. Route the field wiring through the access hole in the housing and through
the access hole in the housing interface board.
5. Install the supplied ferrite bead on the power cable as close to the housing
as possible, preferably within 24 in. (609 mm).
6. Stagger the housing wing tabs so that they are at different heights (see
Figure 2-7).
7. Push the wing tabs flat against the housing and insert the housing into the
ceiling.
8. Turn the wing tab screws clockwise to rotate the tabs out, and then tighten
the tabs against the ceiling. The recommended maximum torque is
0.740.92 ft·lb (1.01.25 N·m).

Table of Contents

Other manuals for Honeywell equIP Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Honeywell equIP Series and is the answer not in the manual?

Honeywell equIP Series Specifications

General IconGeneral
BrandHoneywell
ModelequIP Series
CategorySecurity Camera
LanguageEnglish

Related product manuals