14 Installation and assembly
114
BIESSE S.p.A. © - p726k0003.fm251111
14.8 Connecting the machine to the pneumatic
system
Before connecting the machine to the pneumatic system, bear in mind the installation area
requisites indicated in paragraph 14.2.
The operation involves connecting the relative
supply tube to the connector A (D = 14mm) on
the side of the dryer unit.
The supply pressure is shown on the relevant
pressure gauge, and must be 7 bar. If
necessary, it can be adjusted as follows:
1. Grasp the adjuster knob B and pull it until it
unlocks.
2. Tighten it to increase the pressure, or
loosen it to decrease the pressure. After
adjusting, press the knob to lock the
rotation.
14.9 Equipment supplied
The machine is supplied with an equipment kit; these components do not require any special
requisites and/or procedures.