EasyManua.ls Logo

Intermac Primus 184 - 13.2 Parts to be transported

Default Icon
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13 Handling and transport
98
BIESSE S.p.A. © - p725k0003.fm251111
13.2 Parts to be transported
The machine is transported on a lorry or in a container, after the various parts have been
disassembled. The electrical cabinet is packed next to the machine itself.
Double length containers are used to hold the machine and the electrical cabinet, with the
guards packed separately.
For the various machine models, the parts to be transported are as follows:
Each machine model is supplied as standard with a crate for transportation. Handle
with a forklift or transpallet only.
PRIMUS 184 Weight in kg
3-axis machine 3700
5-axis machine 3750
console 470
UHP intensifier 1450
abrasive propulsor (optional) 70
Big Bag holder (optional) 220
pallet of abrasive 1000
PRIMUS 322/324 Weight in kg
basin 2500
beam + heads 1800
UHP intensifier 1450
pallet of abrasive 1000
base unit 600
Electrical cabinet 460
console 1 and 2 300
hydrocyclone 300
Big Bag holder (optional) 220
crossbar unit 200
abrasive propulsor (optional) 70

Table of Contents