EasyManua.ls Logo

Juniper M7i - Chapter 16 Installing the M7 I into a Rack; Tools and Parts Required to Install the M7 I Router into a Rack; Installing the M7 I Cable Management System

Juniper M7i
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 16
Installing the M7i into a Rack
Tools and Parts Required to Install the M7i Router Into a Rack on page 109
Installing the M7i Cable Management System on page 109
Moving the Mounting Brackets on page 110
Installing the M7i Router Into the Rack on page 110
Tools and Parts Required to Install the M7i Router Into a Rack
To install the chassis into a rack, you need the following tools and parts:
Phillips (+) screwdriver, number 2
Related
Documentation
Initially Configuring the M7i Router on page 129
M7i Chassis Description on page 11
M7i Chassis Lifting Guidelines on page 233
Installing the M7i Cable Management System
The cable management system organizes and supports the PIC cables to prevent damage.
To install the cable management system (see Figure 29 on page 110):
1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect
the strap to one of the ESD points on the chassis. Verify that the router is attached to
a proper earth ground.
2. Use a number 2 Phillips screwdriver to loosen the screws that secure the mounting
brackets to the chassis, and remove the mounting brackets.
3. Locate the cable management racks and appropriate screws in the accessory box.
4. Slide the cable management rack into the slots at the front of the chassis.
109Copyright © 2019, Juniper Networks, Inc.

Table of Contents

Other manuals for Juniper M7i

Related product manuals