EasyManua.ls Logo

LEMKEN Primus 10 - Page 108

LEMKEN Primus 10
218 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
106
Close the cover (1) of the induction con-
tainer.
To flush the induction system, switch the
following levers up into the ON position:
Canister flushing nozzle
Edge wetting
Agitator nozzle
Open the suction valve so far that no li-
quid can escape from the induction con-
tainer.
After flushing, set the following levers
down to the OFF position in order to clo-
se the valves:
Canister flushing nozzle
Edge wetting
Agitator nozzle
1

Table of Contents

Related product manuals