107
Close the suction valve.
Switch the selector switch to the main
tank.
Switch the distributor valve to spraying.
Because of the limited content of the fresh water tank we recom-
mend that for
the cleaning of empty spraying agent canisters or
flushing of the induction system with fresh water,
fresh water is sucked in from a filler hose via the selector valve,
see «Filling main container, Page 90».
6.9 Folding out sprayer boom
Applications:
For volumetric metering or calibrating
Before distribution
To clean the piping system
Potentially fatal electric shock due to overhead lines
The unit can reach the height of overhead lines when folded out.
This could cause an electrical accident that leads to a potentially
fatal electric shock or fire.
Never fold the device in and out near overhead lines.