EasyManua.ls Logo

LEMKEN Primus 10 - Page 118

LEMKEN Primus 10
218 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
116
Rotate nozzle holder to an open positi-
on.
For sprayer booms with multiple nozzle
holders (4) in which all nozzle holder po-
sitions are fitted with nozzles, remove
one bayonet cap with nozzle (5) for
each.
Install drop hoses (6) with the inserted
seals and metering washers (7) on the
nozzle holders.
Carefully fold in the sprayer boom.
The drop hoses may not get caught on
any components or stuck in the
wheels.
When folding in the boom, pay attenti-
on to the incline position of the imple-
ment and the acceleration forces
when cornering.
Completely extend sprayer boom.
To check the seals and the function of
the drop hoses:
Spray with water.
5
4
7
6

Table of Contents