122
Move with increased travel speed.
Open and close part-width section va-
lves (20) with switchbox.
ATTENTION: Only switch the part-width
section valves.If the nozzles are swit-
ched off via the control unit, the central
bypass valve (21) opens and the water
is pumped into the main tank.
If the distribution has to be interrupted
(e. g. at the end of a tramline):
Switch off the PTO shaft.
ATTENTION: If the nozzles are switched
off via the control unit, the central by-
pass valve (21) opens and the water is
pumped into the main tank.This changes
the concentration of the spraying agent.
After the system cleaning:
Switch off pump via PTO shaft.
In the control:Switch off nozzles.
To open the control valve (2):Press and
hold softkey for 4 seconds.