Make sure three people are lifting the sever by holding the 1 lift points.
Rack front
Figure 82. Lifting up the server
Step 5. From the front of the rack, install server into the rails.
Note: Before installing the inner rails to the intermediate ones, make sure that the ball retainers on
both sides reach the outmost position. If the retainers are not in good position, slide them to the
front until they stop.
Figure 83. Interlocking rails
Chapter 5. Hardware replacement procedures 95