General operation procedure
Lorrca Maxsis User Manual Page 101
Version 5.04 MRN-231-EN
7. GENERAL OPERATION PROCEDURE
7.1. Powering up
Switch ON the Lorrca.
Switch ON the PC and printer.
Start Lorrca software.
Steady state
After switching on, the Lorrca MaxSis needs 5 minutes to warm up.
For pO2 scan, the Lorrca Maxsis needs at least 30 minutes to warm up.